Detailed design of Drainage System for Putignano Town

Project Client

AQP - Acquedotto Pugliese Spa

Country

Italy

Region

Europe

Start Date

2009

End Date

2013

Project Description:

Final design for the construction of the Putignano’s WWTP out let pipeline. The diameter shall be DN 500 for a total length of 19 km and the material selected is GRP. The project includes a Pumping station for the maximum design flow rate of 150 l/s and an hydraulic disconnector.

Warning: some page functionalities could not work due to your privacy choices: