Detailed design of Drainage System for Putignano Town

Project Client

AQP - Acquedotto Pugliese Spa

Country

Italy

Region

Europe

Start Date

2009

End Date

2013

Project Description:

Final design for the construction of the Putignano’s WWTP out let pipeline. The diameter shall be DN 500 for a total length of 19 km and the material selected is GRP. The project includes a Pumping station for the maximum design flow rate of 150 l/s and an hydraulic disconnector.

My Agile Privacy

This site uses technical and profiling cookies. 

You can accept, reject, or customize the cookies by clicking the desired buttons. 

By closing this notice, you will continue without accepting. 

Warning: some page functionalities could not work due to your privacy choices: