Detail Design of the Rehabilitation and Upgrade of Water Supply System in Fogo Island
Project Client
Water Utility Aguabrava
Country
Cape Vert
Region
Africa
Project Description:
Rehabilitation and upgrading of the water supply system of the island able to cope with long term water requirement up to horizon year 2040. The project includes main water conveyance system 77,2 km extension (HDPE/Steel pipes dia. 250÷100 mm) and rehabilitation of the main Pumping stations (over 140 KW) and new water storage reservoirs for a total volume of 1,300 m3.