The aim is to prepare the Final and Detailed Design of the rehabilitation and upgrade of Montemesola WWTP (1.600 m3/d). The project provides the process calculations and the structural design of the new Pre-treatment, Oxidation -Nitrification and sludge Stabilization tanks, and the rehabilitation of the existing tanks (Secondary sedimentation and Disinfection).