Preliminary Design,Final Design and Tender Dossier for the new 4 lanes road long around 45 km.The works includes bridges, culvert and retain walls.

YEAR 2004 – 2005
COUNTRY Albania
CLIENT General Road Directorate (Tirana, Albania)