The project involves the construction of diversion on Sarmento river, included a concrete weir spillway with 820 m3/s flood design discharge; hydraulic tunnel (10 m2 area section and 2 km length) between the diversion and Sinni river basin, to feed the Monte Cotugno dam water storage.
YEAR | 2000 | |
COUNTRY | Italy | |
CLIENT | Ente Sviluppo Irrigazione Puglia e Irpini (Bari, Italy) |