Country | Year | Title | Short Description | Client |
---|---|---|---|---|
Ghana | 2021 - 2025 | GARID Component 3: Preparation of Community Facilitation, Planning, Preliminary and Detailed Engineering Designs for Three Low-Income Communities (PART 1) and Contract’s management/Supervision of Works (PART 2) | The infrastructures of the low-income communities object of the assignment are: road, drainage, on site sanitation systems for residential and public, solid waste collection, business plan for the Feacal and solid waste management, including the collection and treatment, delivery mechanism and new approach for emptying of the On site Sanitation systems. |
Ministry of Works and Housing - Ghana |
SIerra Leone | 2019 | FWC SIEA 2018- LOT 2: Infrastructure, sustainable growth and jobs | Regional project meant to address the political, legal and institutional components for improved transport policy implementation. Will help to improve governance in the transport sector through the drafting and monitoring of regional community directives and rules, harmonization of practices and implementation of the rules at national level. |
EU Delegation to Sierra Leone |
Ukraine | 2017 | Analysis of the current state of play in the inland waterways transport sub-sector and performance on Dnieper river,FWC BENEF 2013 Lot 2 – Transport and Infrastructures | The objective of the assignment is to facilitate and promote the reform in the waterborne transport. Was included provision of recommendations for improvement and assistance in the adoption of the draft IWW law and eaboration of the Terms of References for a new technical assistance project “Assistance for Dnieper transport development” suitable in structure and quality for the EU external assistance tender procedure and requirements. |
Delegation of the European Union to Ukraine |
African Union | 2016 - 2017 | FWC BENEF 2013 Lot 2 – Transport and Infrastructures | Technical assistance aimed at strengthening Africa wide capacity to regulate, organize, promote and finance improved inter regional and continental transport infrastructure and services through interconnectivity across regions by promoting safe trans-boundary transport corridors and harmonized transport policies. |
EU Delegation to the African Union – Operations Section in Addis-Abeba, Ethiopia |
Uganda | 2016 | Technical Assistance in Design, Business Development and Environmental Policy and Management to the Uganda National Roads Authority. FWC BENEF 2013 Lot 2 – Transport and Infrastructures | Capacity strengthening initiative. Advisory services for setting up UNRA internal design units, business development planning and operational environmental policy and management. |
Delegation of the European Union to Uganda |
Benin | 2015 | Etude de faisabilité du franchissement du bas-fonds de Womey sur la lagune de Djonou dans la commune d’Abomey Calavi. FWC BENEF 2013 Lot 2 – Transport and Infrastructures | Feasibility Study for the construction of the earth road that will cross the Womey lowland, on the Djonou lagoon, in the town of Abomey-Calavi. |
Delegation de l’UE au Benin |
Jordan | 2015 | Technical Assistance for the Land Transport Regulatory Commission (LTRC). FWC BENEF 2013 Lot 2 – Transport and Infrastructures | Review of the institutional and legal status of the LTRC. Capacity Building including training needs assessment in order to formulate a comprehensive multidisciplinary training program for the staff of LTRC. Development of a regulatory framework of road safety and transport units. |
Delegation of the European Union to Jordan |
Mozambique | 2014 - 2015 | FWC BENEF 2013 Lot 2 – Transport and Infrastructures. | Technical support for the preparaton of technical documentation for the rehabilitation and upgrading the two district hospital including detailed preliminary projects for all facilities, tender documents following EDF procedures in two distinct lots, one for each hospital, assistance to tender process and award of respective work contracts. |
Delegation of the European Union to the Republic of Mozambique |
Kenya | 2014 - 2015 | FWC BENEF 2013 Lot 2 – Transport and Infrastructures | Technical Assistance to provide the European Union and the Government of Kenya with an assessment of the achievements of the Institutional Capacity Building programme to date and to make recommendations for the remaining implementation period to ensure the project purpose is achieved and the results are sustained |
Delegation of the European Union to the Republic of Kenya |
Italy | 2008 -2009 | Technical Assistance to the Marco Polo real estate company (Roma) | Technical Assistance for the preparation of building’s rehabilitation and restoration projects. |
Marco Polo spa (Rome, Italy) |
Albania | 2005 -2008 | Integrated Rehabilitation Programme of the Lapraka urban area | Preliminary Design, Final Design & Tender Documents and Supervision of Works for the rehabilitation of the basic infrastructure in the Lapraka area, including parks and someexisting building. |
Ministry of the Territory Adjustment and Tourism (Tirana, Albania) AICS |
Italy | 2005 -2008 | Integrated Rehabilitation Programme of the Hippodrome of Capanelle | Preliminary Design, Final Design & Tender Documents for the rehabilitation of the infrastructure and facilities of Capanelle Hippodrome extended over 100 ha. |
Comune di Roma/Hippo Group (Rome, Italy) |
Albania | 2004 | Bovilla WTP land slide consolidation works | Final design of the land slide consolidation works, including sub-surface drainge system and reatining walls. |
Tirana Acque scarl (Tirana, Albania) |
Italy | 2004 | Rehabiliation of the Palestrina town central area | Preliminary design and detailed design of Piazza della Liberazione rehabilitation, including new commercial building and restoration of central square. |
Comune di Palestrina (Palestrina, Italy) |
Italy | 2000 | Archeologically area of Villa Adriana | Master plan and Detailed Design of the consolidation activities of the Roman age “Cento Camerelle” complex. |
Ministero dei Beni Culturali ed Ambientali (italy, Rome) |
Italy | 1998 | Archaeological area of Villa Adriana (Tivoli) | Final and detailed design of Tourist Reception Centre of Villa Adriana archaeological area, including book shop, restaurant and tourist facilities. |
Italian Ministero dei Beni Culturali ed Ambientali (Rome, Italy) |
Italy | 1996 | Archaeological Museum of Sperlonga town | Final and detailed design of Sperlonga Archaeological Museum rehabilitation works. The project included the rehabilitation of the existing museum concrete structures, and the construction of new exhibition rooms (1,000 m2). |
Italian Ministero dei Beni Culturali ed Ambientali (Rome, Italy) |
Tanzania | 1992 - 1994 | Tanzania Crop Storage Project (Ruvama, Mbeya, Ruka and Arusha Districts) | Supervision of construction of no. 14 steel godowns in Ruvuama, Mbeya, Rukwa and Arusha Districts for a total storage volume of 120,000 m3. |
Italian Ministry of Foreign Affairs (Rome) |
Filter by country: