carlo

About sws-consulting-admin

This author has not yet filled in any details.
So far sws-consulting-admin has created 61 entries.

Rehabilitation and upgrade of Monte Madonna Basso Reservoir in Formello (Rome District)

The main task of the project is the enlargement of the existing old reservoir with a new underground tank with a capacity of 2.000 m3, the realization of a new pumping station, and the rehabilitation of 1 km of distribution pipeline

Treatment of odour of sludge treatment line in Roma Sud WWTP

The assignment is the design of 6 (six) different treatments of odour dedicated to pre-treatment, sludge thickening, and dewatering tanks for a total flow rate of 35.000 Nm3/h using scrubber and biofilters.

Rehabilitation and upgrade of Montemesola WWTP in Puglia region

The aim is to prepare the Final and Detailed Design of the rehabilitation and upgrade of Montemesola WWTP (1.600 m3/d). The project provides the process calculations and the structural design of the new Pre-treatment, Oxidation -Nitrification and sludge Stabilization tanks, and the rehabilitation of the existing tanks (Secondary sedimentation and Disinfection).

Detailed Design of Sewerage System of Ponte Ladrone Lot II

Detailed Design of Sewerage System of Ponte Ladrone II Lot (approx. 150.000 inhabitants) includes 3,0 km (ND 1200mm-1800mm) of which 2,3 km realized by microtunnelling, a pumping station (600 kW) and an some underpasses of railways, roads and rivers.

Seman River Risk Assessment and Management Project

Hydrological and Hydraulic Study of the intersection of Seman River and the Fier ByPass Road Section (Corridor North-South). Detailed Design of n. 32 concrete box culverts required to improve the drainage capacity through the road embankment to mitigate the risk of overtopping of the protection dyke on the hydraulic left of Seman River (Qmax = 2.200 m3/s).

Etude de faisabilité du franchissement du bas-fonds de Womey sur la lagune de Djonou dans la commune d’Abomey Calavi. FWC BENEF 2013 Lot 2 – Transport and Infrastructures

Feasibility Study for the construction of the earth road that will cross the Womey lowland, on the Djonou lagoon, in the town of Abomey-Calavi.

Technical Assistance for the Land Transport Regulatory Commission (LTRC). FWC BENEF 2013 Lot 2 – Transport and Infrastructures

Review of the institutional and legal status of the LTRC. Capacity Building including training needs assessment in order to formulate a comprehensive multidisciplinary training program for the staff of LTRC. Development of a regulatory framework of road safety and transport units.

Technical Assistance in Design, Business Development and Environmental Policy and Management to the Uganda National Roads Authority. FWC BENEF 2013 Lot 2 – Transport and Infrastructures

Capacity strengthening initiative. Advisory services for setting up UNRA internal design units, business development planning and operational environmental policy and management.

Analysis of the current state of play in the inland waterways transport sub-sector and performance on Dnieper river,FWC BENEF 2013 Lot 2 – Transport and Infrastructures

The objective of the assignment is to facilitate and promote the reform in the waterborne transport. Was included provision of recommendations for improvement and assistance in the adoption of the draft IWW law and eaboration of the Terms of References for a new technical assistance project “Assistance for Dnieper transport development” suitable in structure and quality for the EU external assistance tender procedure and requirements.

FWC SIEA 2018- LOT 2: Infrastructure, sustainable growth and jobs

Regional project meant to address the political, legal and institutional components for improved transport policy implementation. Will help to improve governance in the transport sector through the drafting and monitoring of regional community directives and rules, harmonization of practices and implementation of the rules at national level.
In particular, the project wil improve the sustainability of road investments (putting a stop to overloading and better governance of road maintenance), improve transport conditions and help set up a facility for technical assistance and studies to assist in preparing blended loan/grant funding operations.