Ars2

About Ars2

This author has not yet filled in any details.
So far Ars2 has created 107 entries.

Archaeological Museum of Sperlonga town

Final and detailed design of Sperlonga Archaeological Museum rehabilitation works. The project included the rehabilitation of the existing museum concrete structures, and the construction of new exhibition rooms (1,000 m2).

Pipeline Mola Cavona-S. Palomba (Rome)

The project involves the construction of an iron cast pipeline dia. 1200 mm of Mola Cavona-S. Palomba aqueduct.

Maswa District Water Supply Project (Maswa District)

Supervision of construction and equipment installation of the Maswa District Water Supply Project.

  • 16
    Permalink

    Development of the rural areas in the territory of the IX Mountain Community (Tivoli)

Development of the rural areas in the territory of the IX Mountain Community (Tivoli)

Feasibility Studies and Detailed Design for the rehabilitation of the Capo d’Acqua spring (10 l/s) and of the pipeline in Marcellina municipality.

Autoroute Est-Ovest -Lakhdaria (Wilaya de Bouira)

Design and consultancy concerning Tender for the award of the construction of motorway trunk Lakhdaria-Liasison, including no. 3 viaducts in prestressed concrete with 167 m, 120 m and 200 m span.

Destricella Water distribution system (Catania)

Hydro agricultural development programme in Destricella area with irrigation distribution system and water distribution system.

S.Roque Dam Project (Province of Pangasinan)

Co-ordination of the S.Roque multipurpose dam Prefeasibility Study. The Project consists of a Roller-Compact Concrete dam on Agno River for power and irrigation purpose (Province of Pangasinan).

Corumana Dam (Corumana)

Technical Assistance activities to carry out the Final technical and administrative Inspection required prior to Corumana Dam handover to the Client. The works include construction of an earth fill dam of regulation storage volume of 1,230 Mmc; embankment volume: 8 Mmc; max. height: 46.5 m, max. length: 2,330 m; concrete spillway: 6,100 mc/s design discharge.

  • 69
    Permalink Gallery

    Wei Wei Development Integrated Programe -Phase II (West Pokot Region)

Wei Wei Development Integrated Programe -Phase II (West Pokot Region)

Technical Assistance to carry out the Final technical and administrative Inspection on Wei-Wei Project required prior to works handover to the Client.

Kagitumba-Muvumba Project (Nyagatare)

Technical Assistance to carry out the Final technical and administrative Inspection on Kagituma-Muvumba irrigation Project required prior to works handover to the Client. The works included 100 ha of rice field irrigation and drainage scheme.