Archeologically area of Villa Adriana
Master plan and Detailed Design of the consolidation activities of the Roman age “Cento Camerelle” complex.
Master plan and Detailed Design of the consolidation activities of the Roman age “Cento Camerelle” complex.
Detailed Design of 1,045 ha sprinkler irrigation area of the Palidoro-S.Severa Irrigation Project-IV phase. Works consist of a pressure conveyance network, distribution and field pipelines.
Technical Assistance activities to the identification of water supply and sewerage systems rehabilitation projects in Luanda to be financed by the Italian Ministry of Foreign Affairs.
The project involves the construction of two land filled water tanks in reinforced concrete for a total storage volume of 50,000 m3.
Master Plan and Final Design of Sigor Irrigation Project-III Phase, in Sigor district-West Pokot Region. The study included: extension of sprinkler irrigation area (300 ha net area), drainage works on the Korellach basin of 3,000 ha; mini-hydro (100 KW) for the energy supply; primary school (200 children), with dispensary.
Final and detailed design of Tourist Reception Centre of Villa Adriana archaeological area, including book shop, restaurant and tourist facilities.
Supervision of construction and equipment installation of the Luanda “Marginal area” sewage collection system and related sewage sea out fall.
Activities of Technical Assistance and Support for the accomplishment of the Italian Law for the Reform of the Water Services (“Galli ” Law), which has as its objectives the introduction of entrepreneurial forms of management of the Integrated Water Services (water resource, water supply systems, sewerage systems, treatments etc.).
The project involves the construction of a storage tank (4,500 m3) equipped with an overflow-system designed with a discharge of 8 m3/s and pumping station (680 KW).
The project involves the construction of a steel pipeline (dia. 1,200 mm, 6 km length) to the hydraulic connection of the EUR Water Centre and ACILIA Water Centre.