Rehabilitation Programme of the Rome town combined sewerage network (Rome)
Final Design and on-site Technical Assistance for the Nord-Ovest main collector.
Final Design and on-site Technical Assistance for the Nord-Ovest main collector.
Detailed Design of road bridge over “Via Emilia” and related junctions.
The works include the Detailed Design and Construction of water intake of Menta Dam for the water supply purpose (discharge 1.0 m3/s design).
Preliminary design of “Castelli Romani” ring road by-passing the cities of Albano and Genzano.
Feasibility study and detailed design of the drainage system and flood control works (Lots I, II and III).
Detail Design of the river training works, including banks protection works and drop structures.
Environmental Impact Appraisal of the II phase of Planes Maestro de Agua potable y Saneamiento de Cuenca.The Master Plan includes the rehabilitation of the water supply and sewerage system of the Cuenca basin (approx. 500,000 inhab..): Estudo Hidrologico.
The project involves the construction of diversion on Sarmento river, included a concrete weir spillway with 820 m3/s flood design discharge; hydraulic tunnel (10 m2 area section and 2 km length) between the diversion and Sinni river basin, to feed the Monte Cotugno dam water storage.
Final design and Detailed design of the A24 motorway slip road, to serve the new urbanization areas E1 Ponte di Nona, PEEP C2 Lunghezza, B4 Castel Verde, PZ n20 Ponte di Nona.
The project involves the construction of steel pipeline (dia. 1,200 mm, 6,5 km length) to the hydraulic connection of the EUR Water Centre and ACILIA Water Centre.