Ars2

About Ars2

This author has not yet filled in any details.
So far Ars2 has created 107 entries.

Bajkaj Landfill Project (Saranda)

Preliminary and Final Design of the sanitary landfill facilities for the south Albania coastal region with a capacity of 24,000 ton/year with 25-year life span.

  • 108
    Permalink Gallery

    Fogo-Island Detail Design of the Rehabilitation works of the Bridges

Fogo-Island Detail Design of the Rehabilitation works of the Bridges

Rehabilitation wotks of the bridges included in the more comprehensive project for the construction of island’s ring road extended over 75 km (Travaux de réhabilitation de la route de cotournement inférieure de l’Ile de Fogo).

  • 54
    Permalink Gallery

    Work Supervision of the rehabilitation of the existing road Shkodra – HaniIOtit

Work Supervision of the rehabilitation of the existing road Shkodra – HaniIOtit

Supervision of works of the rehabilitation road works of 2 lines cross section (1+1) for a total width of 10.50 m. The works includes bridges, culvert, retain wall and lighting system.

  • 109
    Permalink Gallery

    Detail Design of the Rehabilitation and Upgrade of Water Supply System in Fogo Island

Detail Design of the Rehabilitation and Upgrade of Water Supply System in Fogo Island

Rehabilitation and upgrading of the water supply system of the island able to cope with long term water requirement up to horizon year 2040. The project includes main water conveyance system 77,2 km extension (HDPE/Steel pipes dia. 250÷100 mm) and rehabilitation of the main Pumping stations (over 140 KW) and new water storage reservoirs for a total volume of 1,300 m3.

Kukes-Kalimash-Morine Road

Supervision of Works of the 29 km trunk road from Kalimash town to the Kossovo border (Morine).

Technical Assistance to the AQP water utility (Bari)

Technical Assistance for the preparation of wastewater improvement projects in the Provinces of (Lot 1) Brindisi and Taranto and, (Lot 2) Lecce Province (Puglia Region).

Technical Assistance to the AQP water utility (Bari)

Technical Assistance for the preparation of water supply & sewerage projects in the Province of Lecce (Puglia Region).

Porto Romano Hot Spot Project

Preparartion study, Detail Design and Bidding Documents for the remediation of the Porto Romano toxic contaminated site (Lindane & Dichromate).

  • 37_hungary
    Permalink Gallery

    Technical Assistance for rewiew of sewage, WWTP and drinking water quality improvement programme documents supported by Cohesion Fund

Technical Assistance for rewiew of sewage, WWTP and drinking water quality improvement programme documents supported by Cohesion Fund

Technical assistance for the preparation of sewerage and wastewater treatment and drinking water quality improvement projects in Hungary for the period 2004-2006 and ensure technically effective and economical implementation of the projects. The TA included full preparation of application form (AF) as well as supporting documents for each project in compliance with EU directives, and preparation of tender dossiers.

  • kolkata
    Permalink Gallery

    Water Supply and Solid Waste Management in 16 selected Towns in West Bengal (Kolkata)

Water Supply and Solid Waste Management in 16 selected Towns in West Bengal (Kolkata)

Detailed design and Construction Supervision of water supply and solid waste management in selected 16 Municipalities of West Bengal. The works includes of drinking water supply system from deep tube wells and distribution pipelines, and the collection and disposal of solid waste over 16 towns for a of total of 1,000,000 inhb. served.