Hombolo Irrigation Project (Dodoma)
Technical Assistance to carry out the Final technical and administrative Inspection on Hombolo Irrigation Project required prior to works handover to the Client. (600 ha extension).
Technical Assistance to carry out the Final technical and administrative Inspection on Hombolo Irrigation Project required prior to works handover to the Client. (600 ha extension).
Technical Assistance at the job site to the Contractor in the Hammam Boughrara dam construction. The works include construction of an earth fill dam of regulation storage volume: 153 Mmc; embankment volume: 3.5 Mmc; max. height: 58 m, max. length: 973 m; concrete spillway: 5,000 mc/s design discharge.
The project involves the construction of Eur water centre. The EUR water centre consists of a steel ring tank with a capacity of 1,700 mc, 68 m above the ground, with an external dia. of 34 m and a rectangular section of 4.0×5.5 m.
The project involves the construction of Oriolo-Tolfa- Allumiere aqueduct (steel pipeline dia. 200/150 mm 53 km length).
Supervision of construction of fishery godown (8,400 m3), pier and jetty on Lake Victoria.
Supervision of construction of no. 14 steel godowns in Ruvuama, Mbeya, Rukwa and Arusha Districts for a total storage volume of 120,000 m3.
Conception, investigation and technical control of Feasibility Study for 4,000 ha (gross area) of irrigated land in left bank of Anambra river (Ifite Ogwari).
Design and consultancy concerning Tender for awarding the construction works of Scannarello hydroelectric plant (1,200 Kw).
Final design of Wurno Dam rehabilitation works. The project included rehabilitation of an existing irrigation scheme of about 1,200 ha and related Wurno earth fill dam
The project involves the construction of a steel pipeline dia.500/400 mm, 10.5 Km long for the supplying of Aranova, Torrimpietra and Maccarese areas.