Camau city sanitation system project – phase 1
Detail Design and Supervision of the Ca Mau Sanitation Project (133 km system pipeand 25 pumping stations in rehabilitation) – Costruction of a new WWTP (8.000 m3/day)
Detail Design and Supervision of the Ca Mau Sanitation Project (133 km system pipeand 25 pumping stations in rehabilitation) – Costruction of a new WWTP (8.000 m3/day)
Final Design of the rehabilitation works of the Faggiano Town (TA), 1,500 cum/day, preliminary, secondary and tertiary treatment
The objective of the project is the supervision works of a new road from the city of Fier to the city of Levan for a total length of around 22 km. The Fier-Levan road represents a part of the EU South-North corridor of Albania (VII corridor). The proposed new road present a 4 line cross section (2+2) for a total width of 22.00 m (1.75m+2*3.75+1.75m=11.00m for each direction). The works includes bridges, culvert and retain wall.
Rehabilitation of 11 Centralized Irrigation Schemes (CIS), 5 on the banks of the River Prut (Western Moldova) and 6 on the banks of the River Nistru (Eastern Moldova), for an overall extension of 15,500 ha.
Feasibility study and Final Design of the rehabilitation works of road R3 Chisinau-Hincesti-Cimislia-Basarabeasca, from km 31+000 to km 70+000
Supervision of the Contracts for civil and ellectomechanical works within the framework of the National Water Supply and Sanitation Project: ehabilitation/improvement of water supply and sewer system in three (3) urban municipalities (Cahul, Causeni and Ungheni), and twenty three (23) rural communities spread over Moldavian territory.
Detailed Design and Supervision of Works for construction of Orhei WWTP for an overall capacity of 35.000 inhb.The investment for the rehabilitation consist in the construction of a new Wastewater Treatment plant (35.000 PE – 6.000 m3/day) with natural schemes (wetland) and 1,5 km effluent main.
Detailed Design and Supervision of civil and electromechanical works within the framework of the National Water Supply and Sanitation Project. The civil work includes the rehabilitation/improvement of water supply and sewer system in the three (3) urban municipalities (Cahul, Causeni and Ungheni), and twenty three (23) rural communities spread over Moldavian territory.
Final design for the construction of the Putignano’s WWTP out let pipeline. The diameter shall be DN 500 for a total length of 19 km and the material selected is GRP. The project includes a Pumping station for the maximum design flow rate of 150 l/s and an hydraulic disconnector.
Final design for the implementation and rehabilitation of the existing sewage treatment plants in Artena and Palestrina towns for a total of 30,000 P.E. The design includes, but is not limited to the rehbilitation of primary, secondary and tertiary process units, including electrical and SCADA system.